Once summer ends, the 170.4-acre open space around Lake Mohegan becomes a place for walkers, and the big lot at Morehouse Highway and Tahmore Drive stays open to anyone. The Town's own description says the property "is actively used year-around and is one of the most popular of the Town's open space properties." If you walk here from now until spring, you are on ground that has changed a good deal since spring 2024. Most of that change came in small pieces, many of them built by local Eagle Scout candidates working with the Fairfield Conservation Department. The next piece sits under the asphalt where you park.
The Yellow Trail, rebuilt one boardwalk at a time
The Town's Lake Mohegan page puts the Yellow Trail at about 2½ miles. It loops the perimeter, climbs the steep hillside east of the lake and crosses the river north of the Cascades on the Mill River Bridge. That eastern hillside is old gravel-mining ground. Gravel dug east of the Mill River in the early and mid-1900s went largely into building the Merritt Parkway, and the digging is what formed the 17-acre lake and the smaller North Pond. The slopes were left with little or no soil and have filled back in slowly with grasses and wildflowers. On ground like that, boardwalk carries a lot of the trail.
Since April 2024, the Town's trail notices have tracked the Yellow Trail's boardwalk being replaced section by section:
- In April 2024, two Eagle Scout projects replaced boardwalk on the eastern portion of the Yellow Trail. The trail closed from April 9 and was expected to reopen around April 19.
- From April 26 through May 3, 2025, Eagle Scout candidate Martin Alvarez and the Conservation Department replaced 160 linear feet of boardwalk on the southernmost stretch of the Yellow Trail, the part closest to the main parking lot. According to the Town's notice, it was a full replacement that also widened the trail and improved its drainage there.
- On October 7, 2026, the Yellow Trail closed between markers 7 and 15 so Eagle Scout candidate Elliot Nakos of Troop 199 could replace the wooden boardwalk there. On October 14, the Town announced that the trail was fully open again.
Troop 199's fall did not stop at that week. The Conservation Department's Fall 2026 newsletter credits Nakos and fellow troop member Alexander White with building bluebird boxes and a footbridge on a section of the Lake Mohegan Yellow Trail. So if you walk the full loop on Thanksgiving morning, the newest wood under your feet went in about six weeks ago, and the stretch nearest the lot is about a year and a half old.
The Red Trail is the gentler choice when the hillside is icy. It runs about 1.6 miles, is flatter, and stays close to the lake and the Mill River on its way to the Cascades. The Cascades are where bedrock in the riverbed narrows the Mill River about 1,200 feet upstream of the lake and the water drops over a series of ledges.
The meadow uphill of the lot took four growing seasons
At the parking lot you may remember the large vinyl billboard tarps, with signs, laid over the small triangle of ground just uphill. They were the Conservation Department's non-chemical method for controlling mugwort, an invasive plant. In June 2026, the department reported that after more than three years, or four growing seasons, the triangle was blooming with native wildflowers. The Spring 2026 newsletter gives the order of the work: the ground was covered for three growing seasons and then seeded.
The Lake Mohegan meadow is one of several. The department's Summer 2026 newsletter lists new native meadow areas at Lake Mohegan, Mill Hollow and Hoydens Hill, and says native meadows support pollinators, wildlife, soil health and water quality. The older open fields on the eastern slopes are kept open by mowing once a year. A walk from the car to the Yellow Trail now passes the new meadow before it reaches the 2025 boardwalk.
Next, the drainage under the parking lot
The meadow and the boardwalks are finished. The parking lot project is the next piece in line.
On September 2, 2026, Fairfield's Inland Wetlands Agency held a public hearing on the Town of Fairfield Engineering Department's plan for storm system improvements at the Lake Mohegan parking lot and on Morehouse Highway, at 880 Morehouse Highway. Joe Perugini of Weston & Sampson presented the plans along with Megha Jain, the Town's senior civil engineer. The meeting minutes describe catch basins and better drainage in the lot. Most of the work falls between Morehouse Highway and the Mill River, and the pipe running through the lot is 48 inches wide. Two neighbors spoke during public comment, and both supported the plans.
The Agency approved the project unanimously that evening. Engineers estimated the job at two to three months, named fall 2026 as the best season for it, and said it would go out to bid before work starts.
The project has been in design for several years. On January 22, 2025, the Board of Selectmen approved added engineering services from RACE Coastal Engineering of Stratford, worth up to $127,400, for the parking lot drainage and the downstream Morehouse Highway system. That contract extended a 2022 design-services agreement for Lake Mohegan.
If work at the main lot narrows the parking, the Town's open space page lists other ways in. The Cascades access road runs north off Morehouse Highway and has limited parking in its lower area. There are also pedestrian-only entrances from Morehouse Highway, from Morehouse Drive near the Merritt Parkway, and on Eastfield Circle for neighborhood use, with no designated parking at any of them. The Conservation Commission's next regular meeting is December 16.
Trout and winter birds
The Town names shoreline fishing as one of the main activities here and notes that the state stocks both Lake Mohegan and the Mill River with trout every year. This fall, CT DEEP's Fall 2026 stocking report, updated November 19, 2026, shows Fairfield's Mill River Trout Management Area stocked on October 20.
The Town's wildlife list for the property includes egrets, herons, hawks, owls and woodpeckers, with occasional reports of Pileated Woodpeckers and Bald Eagles. The Town's trail map shows the numbered markers. Markers 7 through 15 on the Yellow Trail are the section with the October boardwalk.
Many people pick a home partly for what is within a short walk of it, and the trails at Lake Mohegan are part of that for this corner of town. To talk through the streets around Morehouse Highway, or anywhere else in Fairfield, with people who know the Lake Mohegan area well, The Riverside Realty Group is glad to help. Book an appointment whenever you are ready.